BMS/BAS Supervision

BMS/BAS Supervision

BMS/BAS Supervision

Testing, Adjusting and Balancing of HVAC systems in conjunction with BMS are a critical aspect of for building systems and their integration as per project specifications/operation scenario. 

Well designed Building Automation System will be effective providing;

  1. Successful Planning of Operation Scenario and Actual Point List
  2. Installation of system as taking into account of proper measurement locations for the best possible operation.
  3. Verification of BMS contractor’s installation by controlling PtP (Point to Point Checks). 
  4. Field Equipment on-site calibration as per regulating standards.
  5. Performance Verification of entire system and its integrity.
  6. On-site Re-calibration and fine-tuning of BMS system by close coordination with TAB (Testing, Adjusting, Balancing Contractors.
  7. Final System Integrity Tests and Operation Scenario Verification.